Smart Contracts
Typical timeline: 3-8 weeks
Smart Contract Engineering
Design and implementation for ERC20/721/1155-style assets, protocol modules, governance systems, and upgrade-safe contract suites. We support EVM-first delivery and Solana-style program architecture when the product stack requires it.
What you get
- Specification + invariant document mapped to contract functions
- Implementation with role-based permissions and emergency controls
- Unit, fuzz, and integration test suites with CI configuration
- Gas benchmarks for user-critical methods
- Deployment scripts and environment validation checklist
Best for
- Teams launching new token, vault, or rewards logic
- Protocols migrating from prototype contracts to production
- Projects requiring explicit upgradeability strategy
Common pitfalls we prevent
- Permission sprawl that creates hidden admin risk
- Insufficient coverage for edge-path accounting behavior
- Storage layout drift across upgrades
Protocol Engineering
Typical timeline: 4-10 weeks
Protocol Engineering
Mechanism design and implementation for AMMs, staking systems, lending primitives, synthetic asset structures, and custom state machines. We model economic behavior and implementation constraints together, not as separate tracks.
What you get
- Protocol architecture map with module boundaries and dependencies
- Risk scenarios for liquidity stress, oracle failure, and governance delays
- Configurable parameter sets with operational guardrails
- State-machine tests and simulation-informed validation cases
Best for
- Founding teams moving from whitepaper to executable logic
- Live protocols needing mechanism redesign without downtime
- Products introducing new incentives or collateral models
Common pitfalls we prevent
- Overcomplicated primitives that are difficult to audit and operate
- Parameter systems with no emergency rollback path
- Incentive loops that degrade under changing market regimes
Tokenomics & Launch
Typical timeline: 2-6 weeks
Tokenomics & Launch Support
Implementation-focused token launch planning: emissions logic, vesting schedules, treasury policy flows, and liquidity strategy integration. We build models that can be enforced by contracts and monitored after launch.
What you get
- Emission and vesting implementation blueprint
- TGE operational runbook with decision owner map
- Liquidity provisioning checklist with risk thresholds
- Governance setup guidance for parameter updates
- Post-launch metric dashboard schema
Best for
- Pre-launch teams that need technical launch assurance
- Projects migrating from temporary token architecture
- Teams that need investor-grade operational clarity
Common pitfalls we prevent
- Vesting rules that fail under revocation or transfer edge cases
- Liquidity assumptions that ignore volatility stress
- Launch plans with unclear emergency authority
dApp Engineering
Typical timeline: 5-12 weeks
Full-Stack dApp Delivery
Frontend, wallet flow, indexing, and backend integration for production-grade dApps. We design around failure modes including RPC instability, reorg handling, and transaction confirmation ambiguity.
What you get
- Responsive frontend with clear transaction intent and status handling
- Wallet connection flows with chain-aware guidance
- Indexer/event ingestion and API layer for deterministic state
- Operational logging, alerts, and analytics instrumentation
- Release checklist and support handoff package
Best for
- Teams launching public dApps with real user volume expectations
- Protocols needing a reliable product layer on top of contracts
- Existing products experiencing wallet/on-chain UX drop-offs
Common pitfalls we prevent
- State desync between UI and blockchain events
- Wallet error handling that confuses users and support teams
- Unbounded indexing pipelines that fail during traffic spikes
Security Readiness
Typical timeline: 2-5 weeks
Security Readiness & Audit Handoff
Security preparation for high-stakes releases. We do not replace external auditors; we make your codebase easier to audit and your team faster at remediation.
What you get
- Threat model with trust assumptions and abuse cases
- Access-control map and privileged action checklist
- Static analysis and test-coverage gap report
- Audit handoff packet with architecture notes and known limitations
- Issue triage framework for remediation planning
Best for
- Teams preparing for formal third-party audits
- Projects recovering from rushed pre-launch development
- Protocols requiring stronger monitoring and incident readiness
Common pitfalls we prevent
- Late-stage audit findings caused by missing threat assumptions
- Coverage blind spots in critical accounting flows
- No runbook for production incident communication and containment